Monday, June 22, 2015

May 28th- Trim, Doors and Details!!

After the prime coat of paint is painted- the wood trim is installed and interior doors are hung!













Antique pantry door we are in the process of painting


Next the trim is painted and the the second coat of wall paint is added





                                master bath ------------ >











On the side- Seth and I are working on some projects to add a special touch to the house-

Barn door for the master bathroom!!




And... Antique vanity for the powder room (still in process- need to add the sink and faucet)






May 22nd- Hardwood Floors and Interior Painting!

The inside of the house is starting to look like a real house!  The interior walls are being painted and the unfinished hardwood floors are being installed in the downstairs. We picked 4 inch red oak for the flooring.  It will be sanded and finished in a month or so.











Sunday, May 17, 2015

Adding the brick and dry wall

May 17th- Things are moving along on the inside and outside of the house.  Inside- sheet rock has been hung and patched and on the exterior- they are working on the brick!

Exterior:





Interior:






I am also deciding on interior paint colors during this time:







Adding interior details and painting the exterior!


The "rough in" plumbing goes in first then electrical wiring and HVAC




Next the exterior gets painted!!









Getting her "dried in"

Now that framing has been completed, the roof, windows and house wrap are added to make the house water tight as soon as possible.











After the windows and roof comes the siding: